SDM120 CT Meter (Single-Phase)
SDM120CTM-40mA + ESCT-TA16
The Eastron single-phase CT meter commonly paired with Deye hybrids — tells the inverter what the whole house is importing or exporting so zero-export and self-consumption control work. Polled over RS485 Modbus at 9600 baud; ships with the ESCT-TA16 clip-on CT.
- Role
- External grid meter for Deye hybrids
- Phase
- Single (three-phase sites use the SDM630MCT)
- Communication
- RS485 Modbus, 9600 baud
- CT
- ESCT-TA16 clip-on, 40 mA secondary
- Meter ID
- The inverter polls a fixed Modbus address — commonly 1
Specifications
Communication
- Bus
- RS485 (A/B two-wire) to the inverter meter port
- Protocol / baud
- Modbus RTU, 9600
- Address
- Must match the ID the inverter polls (commonly 1) — see the meter-ID guide for the locked-variant workaround
Measurement
- CT
- ESCT-TA16 clip-on current transformer, 120 A primary / 40 mA secondary, 16.3 mm aperture
- CT placement
- Grid side, all consumption and solar downstream — arrow orientation per the wiring guide
Terminals
- 1 · 2
- CT secondary — S1 (white) to 1, S2 (black) to 2
- 3 · 4
- Voltage reference: 3 = N, 4 = L. Also powers the meter — it needs no separate supply
- 5 · 6 · 7
- Pulse outputs — not used on a Deye system
- 8 · 9 · 10
- RS485: 8 = G, 9 = B−, 10 = A+
Set-up
- Entering set-up
- Hold the single front button for 3 s; click to scroll
- Factory defaults
- Address 001, baud 2400 — the baud always has to be changed
- CT ratio
- Set CT 1 = 120 for the ESCT-TA16. On MID meters the CT ratio can be set once only
Why it matters
A Deye hybrid can only manage what it can see. Without a working external meter the inverter knows its own output but not the site’s grid flow — so zero-export limits, self-consumption logic and the consumption curves in DeyeCloud all depend on this one small box being wired and addressed correctly.
The two classic failure modes are covered by their own pages: the meter answering on the wrong Modbus ID (SDM120 meter ID fix) and the CT clipped on backwards or in the wrong place (CT direction reversed). Three-phase sites use the SDM630MCT with the same CT.
⚠ Do not wire it to the figure in the Deye manual
The Deye All-in-One manual’s “System connection diagram for the Eastron meter” (printed p.24) draws an SDM230. That is a direct-connect meter — the mains runs in on terminals 1/3 and out on 2/4, RS485 on 5/6/7 — and Australia does not use it. Confirmed with Deye application engineering, 3 September 2026.
What we ship is CT-operated: the mains never enters the meter. Terminals 1 and 2 are
the CT secondary, not a current path. Wire it to the Eastron manual linked under Documents,
and set Advanced Function → Meter Select = Eastron-1P on the inverter.
The CT
ESCT-TA16, 120 A in, 40 mA out, split core, 16.3 mm aperture, 1 m white/black leads.
The polarity marks sit on P1 and on the white lead, so white is S1. Eastron’s own
instruction is “P1 in, P2 out, and the secondary must never be open-circuited” — clamp it
on the grid live with the case arrow pointing away from the grid, and land both leads
before the conductor goes live.
Plan & design
Before anything is ordered — sizing, pairing and design decisions for the SDM120 CT Meter (Single-Phase).
Pairs with
AI-W5.1 All-in-One BESS · 3.6–12 kW + up to 50 kWh 3.6–12 kW
SG04LP1 Single-Phase Hybrid · 3–6 kW 3–6 kW
G04 / G02P1 Single-Phase String Inverter · 5–10 kW 5–10 kW
SG05LP1 AM2-P Single-Phase Hybrid · 3.6–10 kW 3.6–10 kW
SG02LP1 Single-Phase Hybrid · 10–12 kW 10–12 kW
SG01LP1 Single-Phase Hybrid · 14–16 kW 14–16 kW Install & commission
On the wall, wired, energised and registered — in the order the job actually runs.
Troubleshoot
Known issues for this model, worst first — and every fault code it can show.
- Check External meter not communicating (SDM120) The inverter reports no meter / meter offline, even though the SDM120 display is lit.
- Check Import / export readings are reversed DeyeCloud shows the system exporting when the house is drawing power (or the battery charg…
- Check W04 warning — meter address collision (001 / 002) The inverter raises a W04 warning — often right after enabling Grid Tie Meter2, even on a …
Documents
Everything published for the SDM120 CT Meter (Single-Phase) — and where something is missing, it says so instead of hiding the row.