Suncloud Energy — Deye Technical Hub
NSW New South Wales scheme only Installations completed on or after 1 Sep 2026

NSW PDRS Battery Subsidy Configurator

NSW's Peak Demand Reduction Scheme now pays tradeable certificates (PRCs) for new battery storage on apartment buildings, business sites and large C&I facilities. Build a Deye system below and see the certificate count, eligibility checks and the vintage split — calculated straight from the PDRS (Amendment No. 2) Rule 2026, including the correct marginal rates for the 50–100 kWh band.

BESS3 20–200 kWh usable

Apartment buildings

  • Class 2 building with ≥ 4 dwellings
  • Certificate cap: 5 kWh per dwelling
  • Outdoor install · first battery at the meter
  • Highest rate in the scheme (0.12) with new PV
BESS4 20–200 kWh usable

Small & medium business

  • Any non-residential, non-data-centre site
  • Solar optional — if new PV is added it must be ≥ ¼ of battery capacity
  • Tiered rates — full rate above 100 kWh
  • Once per site (shared with BESS5)
BESS5 200 kWh – 30 MWh usable

Large commercial & industrial

  • Certificates on up to 10,000 kWh per site
  • Solar optional — if new PV is added it must be ≥ ¼ of battery capacity
  • Equipment registered with the Scheme Administrator
  • Once per site (shared with BESS4)