Live commissioning advanced 5 min read Updated 24 Sept 2026

BOS-G installation essentials

Rack, cluster control box, indoor rating and the AU-required external DC protection for a BOS-G high-voltage battery.

The BOS-G is a 19-inch rack high-voltage battery: stack 5.12 kWh modules with a high-voltage cluster control box. Key points that catch people out on AU installs:

Mechanical

  • Use the matching rack — 3U-HRACK holds 12 modules, 3U-LRACK holds 8 — plus the HVB750V/100A cluster control box at the top of each cluster.
  • Modules in series set the capacity: 3–12 modules → BOS-G15 … BOS-G60 (15.36 → 61.44 kWh), system voltage 153.6 → 614.4 V.

Indoor only

BOS-G is rated IP20 — it is an indoor product (utility room / dedicated battery room). It is not for outdoor mounting on its own. If the site needs outdoor, put the battery in a Deye outdoor cabinet: the IP55 BOS-G55-Cabinet or the IP54 BOS-G50-Cabinet — see the BOS-G outdoor solution for the builds, kits and siting rules.

AU electrical — external DC protection is required

For the Australian market the BOS-G installation manual requires an external DC overcurrent protection and isolation device that isolates both poles between the battery and the inverter.

  • Size the DC breaker to the inverter’s off-grid peak behaviour, not just steady current — Deye hybrids briefly run 2× rated power for ~10 s, so an under-rated breaker nuisance-trips. A 200 A DC device is the typical spec for large single-inverter clusters; confirm for your configuration.
  • Battery power cable ships with the BOS-G package (commonly 4 AWG × 2, one per BMS input).

Comms & commissioning

  • Battery talks to the inverter over CAN 2.0 / RS485 — land it on the inverter’s BMS port.
  • Bring the cluster up, confirm all modules report, then set battery type and current limits in DeyeCloud.

Figures are indicative. Always size protection and conductors per the BOS-G installation manual and AS/NZS 5139 / AS/NZS 3000, and have a licensed electrician verify the design.